![]() If there is weather that prevents Maryland Transportation Authority (MDTA) from conducting two-way traffic, the event will be cancelled. Plan for delays and a heavy police presence in the area. Last call for the festivities is set for 1:30 pm, and the event area will close at 2:00 pm. Law enforcement will have a temporary cross walk set up for pedestrians needing to cross Route 8. The Maryland Transportation Authority recently started replacing the deck, or the roadway, on the eastbound span. The business park in Stevensville will once again host the post-race festivities, which are open to the public, race participants and spectators. Youll want to check here regularly for quick information regarding construction schedules, as well as weather advisories. Drivers can call 1-877-BAYSPAN (1-877-229- 7726) for 24/7 bridge conditions. The southbound lane of Route 8 will be closed from Main Street to Thompson Creek Road, this includes the exits to westbound Route 50/Bay Bridge on the Route 8 overpass.įor residents that typically access Route 50 WB/Bay Bridge from the exits on the Route 8 overpass, you will be able to access Route 50 WB/Bay Bridge by turning on Main Street and accessing Route 50 from Duke Street. Data include available gas and food services nearby. Select from the map or the list to view traffic cameras and get information about the exit and surrounding area. Black lines or No traffic flow lines could indicate a closed road, but in most cases it means that either there is not enough vehicle flow to register or traffic isn't monitored. Memorial (Bay) Bridge traffic camera locations. During this time frame, the westbound span will be in two-way traffic operations, carrying both east and westbound traffic. Traffic flow lines: Red lines Heavy traffic flow, Yellow/Orange lines Medium flow and Green normal traffic or no traffic. The eastbound span of the Bay Bridge will be closed at 12:00 am Sunday morning to prepare for the runners and is expected to reopen by 2:00 pm Sunday afternoon. The participants will run or walk the 6.2 miles from Northrop Grumman on the western shore, across the eastbound span of the Chesapeake Bay Bridge, along Pier One Road and up Route 8 to the finish line in Chesapeake Bay Business Park. The Bay Bridge Run will take place on Sunday, November 12. ![]() What you need know about detours and traffic. The Bay Bridge Run is Sunday, November 12
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |